[cdi-dev] [JBoss JIRA] (CDI-547) Resolving sync/async observer methods

Antoine Sabot-Durand (JIRA) issues at jboss.org
Tue Dec 1 05:46:00 EST 2015


     [ https://issues.jboss.org/browse/CDI-547?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Antoine Sabot-Durand closed CDI-547.
------------------------------------
      Assignee: Antoine Sabot-Durand
    Resolution: Done


Resolved by clarifying other topic around sync / async observers

> Resolving sync/async observer methods
> -------------------------------------
>
>                 Key: CDI-547
>                 URL: https://issues.jboss.org/browse/CDI-547
>             Project: CDI Specification Issues
>          Issue Type: Clarification
>          Components: Events
>    Affects Versions: 2.0-EDR1
>            Reporter: Jozef Hartinger
>            Assignee: Antoine Sabot-Durand
>             Fix For: 2.0-EDR2
>
>
> There's the [BeanManager.resolveObserverMethods()|http://docs.jboss.org/cdi/api/2.0.EDR1/javax/enterprise/inject/spi/BeanManager.html#resolveObserverMethods-T-java.lang.annotation.Annotation...-] method for resolving observer methods.
> With addition of sync/async events and observers it is not unclear what the semantics of this methods are. We'll most likely need to add new or overloaded methods to make it possible to resolve observers for sync/async events.



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the cdi-dev mailing list