[jboss-cluster-dev] [Fwd: [JBoss JIRA] Created: (JBAS-6691) Upgrade JGroups to 2.6.9]

Brian Stansberry brian.stansberry at redhat.com
Fri Mar 27 13:32:27 EDT 2009


Bela,

I just realized I'd gotten confused about when JGRP-928 was fixed -- 
it's not in 2.6.8 but in the as-yet-unreleased 2.6.9. Can we get a 2.6.9 
by mid April? The cutoff for component updates for AS 5.1 is April 20.

- Brian

-------- Original Message --------
Subject: [JBoss JIRA] Created: (JBAS-6691) Upgrade JGroups to 2.6.9
Date: Fri, 27 Mar 2009 13:20:22 -0400 (EDT)
From: Brian Stansberry (JIRA) <jira-events at lists.jboss.org>
To: brian.stansberry at redhat.com

Upgrade JGroups to 2.6.9
------------------------

                  Key: JBAS-6691
                  URL: https://jira.jboss.org/jira/browse/JBAS-6691
              Project: JBoss Application Server
           Issue Type: Component Upgrade
       Security Level: Public (Everyone can see)
           Components: Clustering
             Reporter: Brian Stansberry
             Assignee: Brian Stansberry
              Fix For: JBossAS-5.1.0.CR1


In particular we need the JGRP-928 fix.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: 
https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira



-- 
Brian Stansberry
Lead, AS Clustering
JBoss, a division of Red Hat
brian.stansberry at redhat.com



More information about the jboss-cluster-dev mailing list