[jboss-dev] Differrences in CC runs for the AS testsuite
Dimitris Andreadis
dandread at redhat.com
Tue Jun 19 14:49:04 EDT 2007
The exact same CC run for jboss-4.2-testsuite-sun-1.5 with close to zero code changes, took
at different times:
http://cruisecontrol.jboss.com/cc/buildresults/jboss-4.2-testsuite-sun-1.5?log=log20070619084727Lbuild.42
171 minutes 32 seconds
http://cruisecontrol.jboss.com/cc/buildresults/jboss-4.2-testsuite-sun-1.5?log=log20070619114948
159 minutes 47 seconds
http://cruisecontrol.jboss.com/cc/buildresults/jboss-4.2-testsuite-sun-1.5?log=log20070619102946
227 minutes 51 seconds
So the slowest run took 42% more time than the fastest run. Obviously this has an impact in
all time sensitive tests.
Is the CC machine loaded with other stuff? What else could explain the time differences?
More information about the jboss-development
mailing list