<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>

<meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
</head>
<body text="#000000" bgcolor="#ffffff">
<font size="-1"><tt>Now that the branch for 6.0.0 CR1 has been created,
I'll start merging the SwitchBoard/jboss-injection changes from
switchboard-integration branch to AS trunk. I'll be starting the merge
process in a few minutes from now. I'll be sending out a mail once the
merge completes successfully with embedded and smoke-tests passing.
Till that time, please do not commit anything to AS trunk. <br>
<br>
Once the merge is completed, the SwitchBoard/jboss-injection work will
continue on AS trunk. All other commits to AS trunk can continue as
usual. However do note that you might see some failures/instability in
the AS testsuite when the switchboard work is in progress. I'll be
committing to trunk only when the embedded/smoke-test pass fully, but
can't promise the same for the full testsuite run. I'll be watching the
AS testsuite run for any regressions and will be fixing them as
necessary.<br>
<br>
-Jaikiran&nbsp; &nbsp; <br>
</tt></font>
</body>
</html>