[jboss-jira] [JBoss JIRA] Assigned: (JBAS-1768) Isolating the test harness

Dimitris Andreadis (JIRA) jira-events at jboss.com
Fri Jul 14 10:55:11 EDT 2006


     [ http://jira.jboss.com/jira/browse/JBAS-1768?page=all ]

Dimitris Andreadis reassigned JBAS-1768:
----------------------------------------

    Assignee: Ruel Loehr

Assign to Ruel, so work on this and the linked tasks can be scheduled, at some point.

> Isolating the test harness
> --------------------------
>
>                 Key: JBAS-1768
>                 URL: http://jira.jboss.com/jira/browse/JBAS-1768
>             Project: JBoss Application Server
>          Issue Type: Task
>      Security Level: Public(Everyone can see) 
>          Components: Test Suite
>    Affects Versions: JBossAS-4.0.1 Final,  JBossAS-4.0.2RC1, JBossAS-4.0.1 SP1
>            Reporter: Adrian Brock
>         Assigned To: Ruel Loehr
>             Fix For: JBossAS-4.0.5.CR1
>
>
> Since some projects are already using the test harness
> org.jboss.test (from the testsuite)
> this needs to be isolated to break the circular build dependency.
> Additionally, we should look at making this available to users
> 1) For their own use
> 2) When reporting problems

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.jboss.com/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        



More information about the jboss-jira mailing list