[jboss-jira] [JBoss JIRA] Updated: (JBAS-3735) Integrate JGroups 2.4.1.SP1 in JBossAS 5
Brian Stansberry (JIRA)
jira-events at lists.jboss.org
Mon Mar 19 14:45:34 EDT 2007
[ http://jira.jboss.com/jira/browse/JBAS-3735?page=all ]
Brian Stansberry updated JBAS-3735:
-----------------------------------
Summary: Integrate JGroups 2.4.1.SP1 in JBossAS 5 (was: Integrate JGroups 2.4.1 in JBossAS 5)
Description:
2.4.1.SP1 is released, need to integrate it into AS HEAD.
I've been integrating various beta, snapshot and CR releases of 2.4 into AS HEAD for quite a while now, so most of the work for this task is done.
was:
When 2.4.1 is released, need to integrate it into AS HEAD.
I've been integrating various beta, snapshot and CR releases of 2.4 into AS HEAD for quite a while now, so most of the work for this task is done.
Update task to use 2.4.1.SP1 rather than 2.4.1.
> Integrate JGroups 2.4.1.SP1 in JBossAS 5
> ----------------------------------------
>
> Key: JBAS-3735
> URL: http://jira.jboss.com/jira/browse/JBAS-3735
> Project: JBoss Application Server
> Issue Type: Task
> Security Level: Public(Everyone can see)
> Components: Clustering
> Reporter: Brian Stansberry
> Assigned To: Brian Stansberry
> Priority: Critical
> Fix For: JBossAS-5.0.0.Beta2
>
>
> 2.4.1.SP1 is released, need to integrate it into AS HEAD.
> I've been integrating various beta, snapshot and CR releases of 2.4 into AS HEAD for quite a while now, so most of the work for this task is done.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.jboss.com/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list