[jboss-jira] [JBoss JIRA] Assigned: (JBAS-6791) Upgrade jboss-ha-server-cache-jbc to 2.0.0.GA
Brian Stansberry (JIRA)
jira-events at lists.jboss.org
Wed Apr 15 12:36:28 EDT 2009
[ https://jira.jboss.org/jira/browse/JBAS-6791?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Brian Stansberry reassigned JBAS-6791:
--------------------------------------
Assignee: Brian Stansberry
> Upgrade jboss-ha-server-cache-jbc to 2.0.0.GA
> ---------------------------------------------
>
> Key: JBAS-6791
> URL: https://jira.jboss.org/jira/browse/JBAS-6791
> Project: JBoss Application Server
> Issue Type: Component Upgrade
> Security Level: Public(Everyone can see)
> Components: Clustering
> Reporter: Brian Stansberry
> Assignee: Brian Stansberry
> Fix For: JBossAS-5.1.0.GA
>
>
> Upgrade from CR1 to GA once the dependency JBC 3.1.0 goes GA (JBAS-6790)
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list