[jboss-jira] [JBoss JIRA] (AS7-5695) OperationStepHandlers for some mod-cluster subsystem ops don't handle rollback
Paul Ferraro (JIRA)
jira-events at lists.jboss.org
Wed Jan 23 19:40:47 EST 2013
[ https://issues.jboss.org/browse/AS7-5695?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Paul Ferraro updated AS7-5695:
------------------------------
Fix Version/s: 7.2.0.Alpha1
> OperationStepHandlers for some mod-cluster subsystem ops don't handle rollback
> ------------------------------------------------------------------------------
>
> Key: AS7-5695
> URL: https://issues.jboss.org/browse/AS7-5695
> Project: Application Server 7
> Issue Type: Bug
> Components: Clustering
> Affects Versions: 7.1.3.Final (EAP)
> Reporter: Brian Stansberry
> Assignee: Paul Ferraro
> Fix For: 7.2.0.Alpha1
>
>
> The Stage.RUNTIME handlers for a number of mod-cluster subsystem ops are not reversing the effects of the op is the result of the overall operation is a rollback, even though it seems like doing so should be possible.
> The ones where I've noticed this are:
> ModClusterAddProxy
> ModClusterDisable
> ModClusterDisableContext
> ModClusterEnable
> ModClusterEnableContext
> ModClusterRemoveProxy
> ModClusterStop
> ModClusterStopContext
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list