[jboss-svn-commits] JBL Code SVN: r30607 - labs/jbossrules/trunk/drools-planner/src/main/assembly/docs.

jboss-svn-commits at lists.jboss.org jboss-svn-commits at lists.jboss.org
Fri Dec 11 10:51:00 EST 2009


Author: ge0ffrey
Date: 2009-12-11 10:51:00 -0500 (Fri, 11 Dec 2009)
New Revision: 30607

Modified:
   labs/jbossrules/trunk/drools-planner/src/main/assembly/docs/UpgradeFromPreviousVersionRecipe.txt
Log:
drools-solver renamed to drools-planner: rename package org.drools.solver to org.drools.planner

Modified: labs/jbossrules/trunk/drools-planner/src/main/assembly/docs/UpgradeFromPreviousVersionRecipe.txt
===================================================================
--- labs/jbossrules/trunk/drools-planner/src/main/assembly/docs/UpgradeFromPreviousVersionRecipe.txt	2009-12-11 15:18:10 UTC (rev 30606)
+++ labs/jbossrules/trunk/drools-planner/src/main/assembly/docs/UpgradeFromPreviousVersionRecipe.txt	2009-12-11 15:51:00 UTC (rev 30607)
@@ -80,23 +80,7 @@
 ----------------------
 
 In 5.1.0.m2, Drools Solver has been renamed to Drools Planner,
-but because of that you will want to do this first:
-The maven dependency has been renamed to drools-planner-core.
-Before in pom.xml:
-    <dependency>
-        <groupId>org.drools.solver</groupId>
-        <artifactId>drools-solver-core</artifactId>
-        ...
-    </dependency>
-After in pom.xml:
-    <dependency>
-        <groupId>org.drools.planner</groupId>
-        <artifactId>drools-planner-core</artifactId>
-        ...
-    </dependency>
-And resync your IDE (IntelliJ, Eclipse, Netbeans) from the pom.xml files.
-If you're still using ANT, replace drools-solver-core-?.jar with drools-planner-core-?.jar
-and adjust your ANT script and your IDE's classpath accordingly.
+and it's best to do that first. See "From 5.1.0.mé to 5.1.0.m1".
 
 
 The method Solver.cancel() has been renamed to Solver.terminateEarly()
@@ -229,7 +213,13 @@
 If you're still using ANT, replace drools-solver-core-?.jar with drools-planner-core-?.jar
 and adjust your ANT script and your IDE's classpath accordingly.
 
+The package has been renamed to org.drools.planner
+Before in *.java, *.drl:
+    import org.drools.solver...
+After in *.java, *.drl:
+    import org.drools.planner...
 
+
 TerminationConfig's maximumHouresSpend renamed to maximumHoursSpend
 Before:
      <maximumHouresSpend>2</maximumHouresSpend>



More information about the jboss-svn-commits mailing list