[jboss-svn-commits] JBL Code SVN: r29730 - labs/jbossesb/workspace/performance/perf1/product/samples/quickstarts/performance.
jboss-svn-commits at lists.jboss.org
jboss-svn-commits at lists.jboss.org
Wed Oct 21 13:14:18 EDT 2009
Author: dward
Date: 2009-10-21 13:14:18 -0400 (Wed, 21 Oct 2009)
New Revision: 29730
Removed:
labs/jbossesb/workspace/performance/perf1/product/samples/quickstarts/performance/BottleNecks.txt
Log:
not tracked here
Deleted: labs/jbossesb/workspace/performance/perf1/product/samples/quickstarts/performance/BottleNecks.txt
===================================================================
--- labs/jbossesb/workspace/performance/perf1/product/samples/quickstarts/performance/BottleNecks.txt 2009-10-21 15:47:42 UTC (rev 29729)
+++ labs/jbossesb/workspace/performance/perf1/product/samples/quickstarts/performance/BottleNecks.txt 2009-10-21 17:14:18 UTC (rev 29730)
@@ -1,22 +0,0 @@
-This purpose of this document is list the top 5 bottlenecks found in JBossESB 4.7 (trunk).
-
-Original Top 5 Bottlenecks
-==========================
-1.
-2.
-3.
-4.
-5.
-
-Work strategy for fixing Bottlenecks
-====================================
-After a bottleneck as been fixed the list of Top 5 Bottlenecks needs to be updated, and after that
-the next issue attended to. And then follow this same proceedure again.
-This because fixing one bottleneck might expose another.
-
-Work strategy for identifying Bottlenecks
-=========================================
-1. Use a profiler to measure the codebase.
- Save the CallTree and HotSpot images from JProfiler to measurement-results.
-
-
More information about the jboss-svn-commits
mailing list