I need to run JBoss 4.2.2 and JBoss 5.0.1 at the same time. When I start 4.2.2 first and then start 5.0.1 I get an Exception about port 8083 already in use. I actually thought that there would be more port conflicts.
What configuration changes do I have to make to run JBoss 4.2.2 and JBoss 5.0.1 at the same time?
Thanks.
View the original post : http://www.jboss.org/index.html?module=bb&op=viewtopic&p=4213476#4213476
Reply to the post : http://www.jboss.org/index.html?module=bb&op=posting&mode=reply&p=4213476