[jbossts-issues] [JBoss JIRA] (JBTM-2362) DistributedRecoveryIntegrationTestCase#testSecondServerFailureBeforeCommit failure

Gytis Trikleris (JIRA) issues at jboss.org
Tue Apr 14 09:29:18 EDT 2015


    [ https://issues.jboss.org/browse/JBTM-2362?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13058286#comment-13058286 ] 

Gytis Trikleris edited comment on JBTM-2362 at 4/14/15 9:29 AM:
----------------------------------------------------------------

For some reason some times interval between deserializer registration and assertion becomes shorter than usual. Because of that, participant is not loaded once the assertion checks participants count.

This is only a test issue, therefore a short sleep before assertion should work.


was (Author: gytis):
Seems that recovery happens before the assertion and therefore participant count is incorrect.

> DistributedRecoveryIntegrationTestCase#testSecondServerFailureBeforeCommit failure
> ----------------------------------------------------------------------------------
>
>                 Key: JBTM-2362
>                 URL: https://issues.jboss.org/browse/JBTM-2362
>             Project: JBoss Transaction Manager
>          Issue Type: Bug
>          Components: REST
>            Reporter: Gytis Trikleris
>            Assignee: Gytis Trikleris
>            Priority: Blocker
>             Fix For: 5.0.5
>
>
> http://albany.eng.hst.ams2.redhat.com/view/Status/job/narayana/PROFILE=MAIN,jdk=jdk7.latest,label=linux/797/



--
This message was sent by Atlassian JIRA
(v6.3.11#6341)


More information about the jbossts-issues mailing list