[jbossts-issues] [JBoss JIRA] (JBTM-3285) Reduce the number of axes on PR jobs

Michael Musgrove (Jira) issues at jboss.org
Thu Apr 9 14:03:16 EDT 2020


Michael Musgrove created JBTM-3285:
--------------------------------------

             Summary: Reduce the number of axes on PR jobs
                 Key: JBTM-3285
                 URL: https://issues.redhat.com/browse/JBTM-3285
             Project: JBoss Transaction Manager
          Issue Type: Enhancement
          Components: CI
    Affects Versions: 5.10.4.Final
            Reporter: Michael Musgrove
             Fix For: 5.next


Our CI system runs a pull request poller which checks for new PRs by looking at the PR description to decide which Jenkins job axes to run. We have quite a few axes (QA_JTS_JACORB, QA_JTS_JDKORB, QA_JTS_OPENJDKORB, QA_JTA, XTS, CORE, BLACKTIE, RTS, mysql, postgres, db2, oracle, TOMCAT, JACOCO, LRA) and if the user, say, just wants to run the XTS axis then CI will start a job for each axis. All but the XTS axis will then check whether it needs to run and then terminate. Each axis can end up taking 20 minutes or so. It would be good to minimise this overhead.

For example, all of the QA axes could be run in one job.





--
This message was sent by Atlassian Jira
(v7.13.8#713008)


More information about the jbossts-issues mailing list