[jbpm-issues] [JBoss JIRA] Resolved: (JBPM-1417) optimize database clean up inbetween tests
Guillaume Porcher (JIRA)
jira-events at lists.jboss.org
Fri Aug 8 10:59:50 EDT 2008
[ https://jira.jboss.org/jira/browse/JBPM-1417?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Guillaume Porcher resolved JBPM-1417.
-------------------------------------
Fix Version/s: PVM 1.0 beta1
Resolution: Done
> optimize database clean up inbetween tests
> ------------------------------------------
>
> Key: JBPM-1417
> URL: https://jira.jboss.org/jira/browse/JBPM-1417
> Project: JBoss jBPM
> Issue Type: Sub-task
> Security Level: Public(Everyone can see)
> Components: PVM
> Reporter: Tom Baeyens
> Assignee: Guillaume Porcher
> Priority: Critical
> Fix For: PVM 1.0 beta1
>
>
> ideally we should get to the following situation:
> * each package has its own configuration and its own session factory
> * all tests with the same session factory should reuse the session factory as much as possible to prevent unnecessary parsing and DB schema creation
> * parts of the test suite that use the same session factory should run sequentially
> * in between tests of the same part, the database should be cleaned (delete from <table>;) for all tables
> * inbetween parts, the db schema should be dropped and the new schema should be created
> This should all work in junit test suite and from mvn command line
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbpm-issues
mailing list