<br><font size=2 face="sans-serif">Can the constraint for an EventWait
node in a flow be code-based (rather than rule-based)? The Eclipse plug-in
(v 5.0.1) doesn't allow this to be specified, unlike say for a Split node,
although the relevant XML can of course be edited.</font>
<br><font size=2 face="sans-serif">Trying to load such a process flow results
in a NullPointerException, because the constraint is always interpreted
as a rule.<br>
</font>
<br><font size=2 face="sans-serif">Ideally what I'd like to do is have
an EventWait node where the constraint tests the value of a process variable.
This then leads me to another question; is there a way of setting the value
of a process variable via the Drools Flow API?</font>
<br>
<br><font size=2 face="sans-serif">Thanks in advance for any help,</font>
<br>
<br><font size=2 face="sans-serif">Alan</font>
<p><font size=2 face="Arial"><b>Tessella plc</b><br>
26 The Quadrant, Abingdon Science Park, Abingdon, Oxfordshire, OX14 3YS<br>
E: Alan.Gairey@tessella.com, T: +44 (0)1235 555511, F: +44 (0)1235 553301<br>
www.tessella.com &nbsp; &nbsp;Registered in England No. 1466429</font>
<p><img src=cid:_1_05CA28CC05CA26780036C07980257657>
<p><font size=1 face="Arial">This message is commercial in confidence and
may be privileged. It is intended for the addressee(s) only. Access to
this message by anyone else is unauthorized and strictly prohibited. If
you have received this message in error, please inform the sender immediately.
Please note that messages sent or received by the Tessella e-mail system
may be monitored and stored in an information retrieval system.</font>
<p>