You 'll want incremental score calculation (with delta's) for your
"end times".<br>
<a class="moz-txt-link-freetext" href="http://docs.jboss.org/drools/release/5.4.0.Final/drools-planner-docs/html_single/index.html#incrementalScoreCalculation">http://docs.jboss.org/drools/release/5.4.0.Final/drools-planner-docs/html_single/index.html#incrementalScoreCalculation</a><br>
<br>
So that naturally puts the calculation of those end times in the
scoreDRL (or IncrementalJavaCalculator if you're not using drools).<br>
Whether or not that endTime should be a property on the model (at
least the model that Planner works with), is an open design
question.<br>
If it isn't, you can use insertLogicals in DRL, like I did in
nurserostering to calculate the number of sequential weekends being
worked etc.<br>
If it is a property on your model, either the DRL must first
"correct it" (with higher salience rules for example),<br>
or custom moves must "correct it" as they are being done (which is
very hard as it entails constraints functionality).<br>
<br>
As for the cloning: it's quite simple:<br>
Either the model's entity contains the endTime property, then clone
it.<br>
If it doesn't, then there's nothing to clone.<br>
I don't see any problems related to the cloning.<br>
<br>
<div class="moz-cite-prefix">Op 18-08-12 01:53, Josef Bajada
schreef:<br>
</div>
<blockquote
cite="mid:CAJOvgLLHsw=iv19B=h3Uev9UEaONCKsg2SfX8EhAPjNV7FVrGA@mail.gmail.com"
type="cite">Hi Geoffrey,
<div><br>
</div>
<div>Following your advice and after gaining some more
understanding of planner, I think approaching the problem as a
chain of tasks one of the other makes sense. It would have some
'wait' time between tasks where the end time of the previous
task is smaller than the minimum time the task has to wait after
its dependency (which could be different from the previous
task).</div>
<div><br>
</div>
<div>I've noticed that in most examples (TSP and VRP), there is
some separation between the model and the planning entity that
is being moved around in the chain, which also makes sense. (For
instance in TSP, Visit is the planning entity while City is the
data entity). When the planning entity gets cloned, the data
entity gets assigned to the clone.</div>
<div><br>
</div>
<div>I am concerned however, that with my dependency between tasks
and their end times (which are as such a property of the
planning entity not the data entity) I won't be able to model
them in this way. (For a task to know whether it has violated
its hard constraint it needs to get access to the end time of
its dependency, which is in the planning entity). My concern is
that I might end up with a whole mess when it comes to the
cloning of tasks. I am also concerned about the performance of
computing the end time of each node recursively based on its
previous task and dependent tasks.</div>
<div><br>
</div>
<div>What is the best approach in this case?</div>
<div><br>
</div>
<div>thanks,</div>
<div><br>
Josef</div>
<div><br>
</div>
<div><br>
<br>
<div class="gmail_quote">On 25 July 2012 08:30, Geoffrey De Smet
<span dir="ltr"><<a moz-do-not-send="true"
href="mailto:ge0ffrey.spam@gmail.com" target="_blank">ge0ffrey.spam@gmail.com</a>></span>
wrote:<br>
<blockquote class="gmail_quote" style="margin:0 0 0
.8ex;border-left:1px #ccc solid;padding-left:1ex">
<div bgcolor="#FFFFFF" text="#000000"> <br>
<div>Op 24-07-12 23:14, Josef Bajada schreef:<br>
</div>
<blockquote type="cite">Hi Geoffrey,
<div><br>
</div>
<div class="im">
<div>Thanks for your reply.</div>
<div><br>
</div>
<div>> Does it make sense to wait longer than 7
mins after task A (presuming no other task forces
occupies the user at that time)?<br>
> Put differently: Can we say that the starting
time of B = Math.max((endTime of task before B),
(endTime of task A + 7 minutes))?<br>
> If we can say that, it's pointless to
investigate the solutions where task B starts 8
minutes after task A and the user doing no task that
last minute.<br>
</div>
<div><br>
</div>
<div>Yes, the starting time of B = Math.max((endTime
of task before B), (endTime of task A + 7mins)) as
long as it is smaller than (endTime of task A +
8mins).</div>
<div>Yes, it is pointless to investigate the solutions
where task B starts 8 minutes after task A and the
user doing no task that last minute. </div>
<div>The 8 minute is just a constraint that the task
in between tasks A and B cannot take longer than
7:59s.</div>
<div><br>
</div>
<div>I am thinking that maybe instead of using time
itself as the planning variable, we would use time
just to determine the Hard and Soft scores. </div>
<div>So if Task B is scheduled after Task A + 8mins by
the solver, then it inflicts on the hard score.
Similarly if Task B is scheduled before Task A + 7
mins. </div>
<div>Does my reasoning make sense in any way?</div>
</div>
</blockquote>
Yes, but personally, I 'd design it differently (although
I have no proof that my way would be better), like this:<br>
"Task B is scheduled after Task A + 8mins by the solver"
=> make this a hard constraint<br>
"Task B is scheduled before Task A + 7 mins" => make
this a build-in hard constraint (= not a constraint in the
scoreDRL or ScoreCalculator, but by design, see manual).<br>
Each Task is assigned to a previousTaskOrPerson (and this
variable is chained). It does not know it's startingTime
directly.<br>
The scoreDRL or ScoreCalculator calculates the
startingTime of a Task dynamically, by applying this
logic:<br>
starting time of B = Math.max((endTime of
previousTaskOrPerson of B), (endTime of task A + 7mins))<br>
Note: "Chained=true" guarantees that there are no cycles
of Tasks and that no Tasks exists with a
previousTaskOrPerson == null.<br>
Note: "(endTime of task A + 7mins)" is not hard coded in
the score function: you won't find "7" or "A" in there.
<div>
<div class="h5"><br>
<br>
<blockquote type="cite">
<div><br>
</div>
<div>thanks,</div>
<div>Josef</div>
<div><br>
</div>
<div><br>
<br>
<div class="gmail_quote">On 24 July 2012 20:46,
Geoffrey De Smet <span dir="ltr"><<a
moz-do-not-send="true"
href="mailto:ge0ffrey.spam@gmail.com"
target="_blank">ge0ffrey.spam@gmail.com</a>></span>
wrote:<br>
<blockquote class="gmail_quote" style="margin:0
0 0 .8ex;border-left:1px #ccc
solid;padding-left:1ex">
<div bgcolor="#FFFFFF" text="#000000"> <br>
<div>Op <a moz-do-not-send="true"
href="tel:23-07-12%2016"
value="+35623071216" target="_blank">23-07-12
16</a>:26, Josef Bajada schreef:<br>
</div>
<div>
<blockquote type="cite">Hi Geoffrey,
<div><br>
</div>
<div>Well I want to leave 'space'
between tasks in the situations where
there are hard constraints that
require me to put this space.<br>
</div>
</blockquote>
</div>
This makes the chaining technique harder to
model, but I wouldn't write it off yet.
<div><br>
<blockquote type="cite">
<div><br>
</div>
<div>As a simple example:</div>
<div> <br>
</div>
<div>Task A: Put pasta in boiling water
(duration 40 seconds)</div>
<div>Task B: Take pasta out of boiling
water (duration 50 seconds, cannot
start before 7 mins after Task A
finishes, cannot start after 8 mins
after Task A finishes)</div>
</blockquote>
</div>
Does it make sense to wait longer than 7
mins after task A (presuming no other task
forces occupies the user at that time)?<br>
Put differently: Can we say that the
starting time of B = Math.max((endTime of
task before B), (endTime of task A + 7
minutes))?<br>
If we can say that, it's pointless to
investigate the solutions where task B
starts 8 minutes after task A and the user
doing no task that last minute.<br>
If we can say that, then chaining can
calculate the the starting time of a task on
the fly differently.
<div><br>
<blockquote type="cite">
<div>Task C: Chop vegetables (duration 2
minutes).</div>
<div><br>
</div>
<div>This will evidently leave some
gaps. The ideal result from the solver
should be:</div>
<div><br>
</div>
<div>Task A: at time 0 (ends at 40s)</div>
<div> Task C: at time 41s (ends at 2:41)</div>
<div>Task B: at time 7:40</div>
<div><br>
</div>
<div>There is a gap between C and B
which is OK. </div>
<div><br>
</div>
<div>If another Task is added to the
story:</div>
<div>
<div>Task D: Prepare sauce (duration 7
minutes)</div>
</div>
<div><br>
</div>
<div>I would want the following result:</div>
<div><br>
</div>
<div>Task A: at time 0 (ends at 40s)</div>
<div>Task D: at time 41s (ends 7:41s)</div>
<div>Task B: at time 8:42s (ends 9:32s)</div>
<div>Task C: at time 9:33s (ends 11:33s)</div>
<div><br>
</div>
<div>Task C can actually take place
before Task A too. </div>
<div><br>
</div>
<div>I still need to read and understand
the chaining functionality properly.
Do you think it would allow me to
achieve the above?</div>
<div><br>
</div>
</blockquote>
</div>
I don't know.<br>
But using continuous variables in a search
problem such as this that smells discrete
with discrete constraints (A must start
before B, ...), could blow up the search
space unnecessarily.<br>
<br>
If you want to look into using continuous
variables: the support for it is limited
currently.<br>
you can reuse the Drools Planner
metaheuristic algorithms (including
termination, score, ...), but there's no
decent generic move factory support for
continuous variables yet.<br>
So you 'll have to write a custom
MoveFactory that creates a limited subset of
moves.<br>
Also, construction heuristics can't handle
continuous variables yet, so you 'll have to
write a custom SolutionIntializer.<br>
There are examples with a custom MoveFactory
and a custom SolutionIntializer where you
can copy paste from, but none with
continuous variables at the moment.
<div>
<div><br>
<blockquote type="cite">
<div>thanks,</div>
<div><br>
</div>
<div>Josef</div>
<div><br>
</div>
<div><br>
<br>
<div class="gmail_quote">On 22 July
2012 20:05, Geoffrey De Smet <span
dir="ltr"><<a
moz-do-not-send="true"
href="mailto:ge0ffrey.spam@gmail.com"
target="_blank">ge0ffrey.spam@gmail.com</a>></span>
wrote:<br>
<blockquote class="gmail_quote"
style="margin:0 0 0
.8ex;border-left:1px #ccc
solid;padding-left:1ex">
<div bgcolor="#FFFFFF"
text="#000000"> Presuming that
you don't want to leave space
between tasks, you can design
your model differently by
using the "chained"
functionality:<br>
it will be far more efficient
and the planning variable
won't be continuous.<br>
<br>
Let's presume you're
scheduling Tasks to Persons.<br>
<br>
@PlanningEntity<br>
class Task implements
TaskOrPerson {<br>
<br>
...<br>
<br>
@PlanningVariable(chained
= true)<br>
@ValueRanges({<br>
@ValueRange(type =
ValueRangeType.FROM_SOLUTION_PROPERTY,
solutionProperty =
"taskList"),<br>
@ValueRange(type =
ValueRangeType.FROM_SOLUTION_PROPERTY,
solutionProperty =
"personList",<br>
excludeUninitializedPlanningEntity
= true)})<br>
public TaskOrPerson
getPreviousTaskOrPerson() {<br>
return
previousTaskOrPerson;<br>
}<br>
<br>
public int getDuration() {<br>
return duration;<br>
}<br>
<br>
public int
getStartingTime() {<br>
int startingTime =
0;<br>
TaskOrPerson
taskOrPerson =
getPreviousTaskOrPerson();<br>
while (taskOrPerson
instanceof Task) { // Every
chain is guarantee to end up
with an anchor (= Person)<br>
startingTime
+= ((Task)
taskOrPerson).getDuration();<br>
taskOrPerson =
((Task)
taskOrPerson).getPreviousTaskOrPerson()<br>
}<br>
return startingTime;<br>
}<br>
<br>
}<br>
<br>
class Person implements
TaskOrPerson {<br>
<br>
}<br>
<br>
For a good example, take a
look at the VehicleRouting
example.<br>
For more info about chaining,
in the manual see section
4.3.4.2.6. Chained<br>
<a moz-do-not-send="true"
href="http://docs.jboss.org/drools/release/5.4.0.Final/drools-planner-docs/html_single/index.html"
target="_blank">http://docs.jboss.org/drools/release/5.4.0.Final/drools-planner-docs/html_single/index.html</a><br>
<br>
<div>Op <a
moz-do-not-send="true"
href="tel:22-07-12%2018"
value="+35622071218"
target="_blank">22-07-12
18</a>:00, Josef Bajada
schreef:<br>
</div>
<blockquote type="cite">
<div>
<div>Hi,
<div><br>
</div>
<div>I am new to Drools
and Drools Planner, so
apologies if I am
asking anything
obvious.</div>
<div><br>
</div>
<div>My objective is to
implement a simple
(for now) planner
which schedules tasks
according to 2 main
criteria:</div>
<div>- Their duration
(in seconds)</div>
<div>- Their
dependencies on other
tasks (e.g. Hard
Constraint that Task B
has to start between
180 and 200 seconds
after Task A
finishes).</div>
<div><br>
</div>
<div>Since there are
gaps between dependent
tasks as part of the
hard constraints other
tasks can be fitted in
between dependent
tasks.</div>
<div>So the Solver needs
to find the optimal
start time for each
task that satisfies
the hard constraints,
and in the shortest
total timeline
possible to complete
all tasks (soft
constraint).</div>
<div><br>
</div>
<div>The main problem I
am finding is that
this start time, which
is essentially the
planning variable is a
continuous variable. </div>
<div>Chapter 4 of the
Drools documentation
mentions very briefly
(Section
4.3.4.1) that
planning variables can
be continuous, but
there does not seem to
be any more details
about how to achieve
this.</div>
<div><br>
</div>
<div>Even if the
planning variable was
discrete (say bins of
5 second intervals),
there is no upper
bound as such.</div>
<div><br>
</div>
<div>How is it best to
handle such planning
variables in Drools
Planner?</div>
<div><br>
</div>
<div>thanks,<br>
josef</div>
<div><br>
</div>
<div><br>
</div>
<br>
<fieldset></fieldset>
<br>
</div>
</div>
<pre>_______________________________________________
rules-users mailing list
<a moz-do-not-send="true" href="mailto:rules-users@lists.jboss.org" target="_blank">rules-users@lists.jboss.org</a>
<a moz-do-not-send="true" href="https://lists.jboss.org/mailman/listinfo/rules-users" target="_blank">https://lists.jboss.org/mailman/listinfo/rules-users</a><span><font color="#888888">
</font></span></pre>
<span><font color="#888888">
</font></span></blockquote>
<span><font color="#888888"> <br>
<pre cols="72">--
With kind regards,
Geoffrey De Smet</pre>
</font></span></div>
<br>
_______________________________________________<br>
rules-users mailing list<br>
<a moz-do-not-send="true"
href="mailto:rules-users@lists.jboss.org"
target="_blank">rules-users@lists.jboss.org</a><br>
<a moz-do-not-send="true"
href="https://lists.jboss.org/mailman/listinfo/rules-users"
target="_blank">https://lists.jboss.org/mailman/listinfo/rules-users</a><br>
<br>
</blockquote>
</div>
<br>
</div>
<br>
<fieldset></fieldset>
<br>
<pre>_______________________________________________
rules-users mailing list
<a moz-do-not-send="true" href="mailto:rules-users@lists.jboss.org" target="_blank">rules-users@lists.jboss.org</a>
<a moz-do-not-send="true" href="https://lists.jboss.org/mailman/listinfo/rules-users" target="_blank">https://lists.jboss.org/mailman/listinfo/rules-users</a>
</pre>
</blockquote>
<br>
<pre cols="72">--
With kind regards,
Geoffrey De Smet</pre>
</div>
</div>
</div>
<br>
_______________________________________________<br>
rules-users mailing list<br>
<a moz-do-not-send="true"
href="mailto:rules-users@lists.jboss.org"
target="_blank">rules-users@lists.jboss.org</a><br>
<a moz-do-not-send="true"
href="https://lists.jboss.org/mailman/listinfo/rules-users"
target="_blank">https://lists.jboss.org/mailman/listinfo/rules-users</a><br>
<br>
</blockquote>
</div>
<br>
</div>
<br>
<fieldset></fieldset>
<br>
<pre>_______________________________________________
rules-users mailing list
<a moz-do-not-send="true" href="mailto:rules-users@lists.jboss.org" target="_blank">rules-users@lists.jboss.org</a>
<a moz-do-not-send="true" href="https://lists.jboss.org/mailman/listinfo/rules-users" target="_blank">https://lists.jboss.org/mailman/listinfo/rules-users</a>
</pre>
</blockquote>
<br>
<pre cols="72">--
With kind regards,
Geoffrey De Smet</pre>
</div>
</div>
</div>
<br>
_______________________________________________<br>
rules-users mailing list<br>
<a moz-do-not-send="true"
href="mailto:rules-users@lists.jboss.org">rules-users@lists.jboss.org</a><br>
<a moz-do-not-send="true"
href="https://lists.jboss.org/mailman/listinfo/rules-users"
target="_blank">https://lists.jboss.org/mailman/listinfo/rules-users</a><br>
<br>
</blockquote>
</div>
<br>
</div>
<br>
<fieldset class="mimeAttachmentHeader"></fieldset>
<br>
<pre wrap="">_______________________________________________
rules-users mailing list
<a class="moz-txt-link-abbreviated" href="mailto:rules-users@lists.jboss.org">rules-users@lists.jboss.org</a>
<a class="moz-txt-link-freetext" href="https://lists.jboss.org/mailman/listinfo/rules-users">https://lists.jboss.org/mailman/listinfo/rules-users</a>
</pre>
</blockquote>
<br>
<pre class="moz-signature" cols="72">--
With kind regards,
Geoffrey De Smet</pre>