<div dir="ltr">Hi all,<div><br></div><div>I am new to Optaplanner and would like some help on understanding how to control the planning value chosen by Optaplanner. </div><div><br></div><div>Based on the info on User Guide and the NQueen example, I understand that  for Local Search algorithms one can use the Move interface (for example  to forbid some specific row change). </div>
<div><br></div><div>However, for the  Construction heuristics have not found any similar option. For these algoritms the only option seems to be to make load adjustements on the score calculations (as the nqueens example does for queens on the same row).  Is this correct or am I missing something ?</div>
<div><br></div><div>Regards</div><div><br></div><div>Tales</div></div>