[switchyard-issues] [JBoss JIRA] (SWITCHYARD-738) Upgrade to Camel 2.9.1
Keith Babo (JIRA)
jira-events at lists.jboss.org
Tue Apr 17 07:11:17 EDT 2012
Keith Babo created SWITCHYARD-738:
-------------------------------------
Summary: Upgrade to Camel 2.9.1
Key: SWITCHYARD-738
URL: https://issues.jboss.org/browse/SWITCHYARD-738
Project: SwitchYard
Issue Type: Task
Components: component-camel
Reporter: Keith Babo
Fix For: 0.5
Upgrade Camel dependencies to 2.9.1. A number of things changed around in core between 2.8.x and 2.9.x, so there may be some more work here than simply bumping the pom version.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.jboss.org/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the switchyard-issues
mailing list