[teiid-issues] [JBoss JIRA] Resolved: (TEIID-378) Only synchronize referenced connector bindings when importing a new VDB

Steven Hawkins (JIRA) jira-events at lists.jboss.org
Wed Jun 10 13:18:58 EDT 2009


     [ https://jira.jboss.org/jira/browse/TEIID-378?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Steven Hawkins resolved TEIID-378.
----------------------------------

    Resolution: Deferred


Deferring post 6.1.1 console work.

> Only synchronize referenced connector bindings when importing a new VDB
> -----------------------------------------------------------------------
>
>                 Key: TEIID-378
>                 URL: https://jira.jboss.org/jira/browse/TEIID-378
>             Project: Teiid
>          Issue Type: Feature Request
>          Components: Console
>    Affects Versions: 6.0.0
>            Reporter: Marc Shirley
>            Priority: Minor
>             Fix For: 6.2.0
>
>
> Synchronization with failed bindings causes an error dialog in Console.  During a VDB import (and the default synchronization at the end), this causes a user to believe there is an issue with the newly imported VDB.
> Per I-T #214848 by john lee:
> Summary:
> Syncronization of unrelated services during VDB Deployment may cause stacktraces unrelated to the current deployment
> Description of problem:
>   Selecting synchronize during deployment of a VDB may cause a stacktrace due to an failing service unrelated to the deployed VDB.
> How reproducible:
>   Deploy and sync a vdb on a server with an unrelated failing service.
> Steps to Reproduce:
> Actual results:
> Expected results:
> Additional info:
>   Per Van Halbert:  only sync the required services w/the deployed VDB.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        



More information about the teiid-issues mailing list