[JBoss JIRA] (FORGE-2584) Build command always skip tests and fails if a profile is set
by George Gastaldi (JIRA)
George Gastaldi created FORGE-2584:
--------------------------------------
Summary: Build command always skip tests and fails if a profile is set
Key: FORGE-2584
URL: https://issues.jboss.org/browse/FORGE-2584
Project: Forge
Issue Type: Bug
Components: Build Tools - Maven
Reporter: George Gastaldi
Fix For: 3.x Future
{{build --profile arquillian-wildfly-remote}} gives the following exception:
{code}
[SEVERE] No goals have been specified for this build. You must specify a valid lifecycle phase or a goal in the format <plugin-prefix>:<goal> or <plugin-group-id>:<plugin-artifact-id>[:<plugin-version>]:<goal>. Available lifecycle phases are: validate, initialize, generate-sources, process-sources, generate-resources, process-resources, compile, process-classes, generate-test-sources, process-test-sources, generate-test-resources, process-test-resources, test-compile, process-test-classes, test, prepare-package, package, pre-integration-test, integration-test, post-integration-test, verify, install, deploy, pre-clean, clean, post-clean, pre-site, site, post-site, site-deploy. -> [Help 1]
{code}
{{build install --profile arquillian-wildfly-remote}} always skip tests even if {{--notest=false}} is specified
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)