If the patch needs to be upstream first, the upstream build can be used to verified it, no?



On Apr 17, 2013, at 1:02 PM, Thomas Diesler <thomas.diesler@jboss.com> wrote:

All would be good if the reporter can verify the patch before it goes in the next EAP release, can he?