View results here -> http://cruisecontrol.jboss.com/cc/buildresults/jboss-4.2-compatibility-matrix?log=log20070324122240Lbuild.42

BUILD COMPLETE -  build.42
Date of build: 03/24/2007 12:22:40
Time to build: 40 minutes 23 seconds
Last changed: 03/23/2007 22:24:49
Last log entry: Document replicationIsPassivation

 Unit Tests: (300)  Total Errors and Failures: (0)
All Tests Passed
 

 Modifications since last build:  (first 50 of 8)
61649modifiedbstansberry@jboss.com//branches/Branch_4_2/ejb3/docs/reference/reference/en/modules/session.xmlDocument replicationIsPassivation
61647modifiedstan.silvert@jboss.com//branches/Branch_4_2/build/build-thirdparty.xmlhttp://jira.jboss.com/jira/browse/JBAS-4236
61646modifieddimitris@jboss.org//branches/Branch_4_2/build/build-thirdparty.xmlrevert to brew build for oswego
61642modifiedthomas.diesler@jboss.com//branches/Branch_4_2/server/src/etc/conf/default/jboss-log4j.xmlAdd SOAPMessageAppender
61641modifiedthomas.diesler@jboss.com//branches/Branch_4_2/system/src/bin/run.confJPDA suspend=n by default
61638modifiedfnasser@redhat.com//branches/Branch_4_2/build/build-thirdparty.xmlSwitch to use Brew built Servlet and JSP APIs
61634modifieddimitris@jboss.org//branches/Branch_4_2/testsuite/src/main/org/jboss/test/util/test/ThreadPoolRunnableUnitTestCase.javaJBAS-4160, add some logging, improve the timing.
61633modifieddimitris@jboss.org//branches/Branch_4_2/build/build-thirdparty.xmlJBAS-4160, rollback the 1.3.4-brew update.