Just running the tests-security-manager target I'm not seeing the server fail to shutdown. I would suspect that there are multiple runs conflicting with each other.

Brian Stansberry wrote:
It looks like the testsuite is failing because the server instance used by tests-security-manager is not shutting down.  The server used by the clustering tests then fails to start due to port conflicts. (The "default" config logs show the securitymgr server still alive 5 mins after the clustering server tries to start.)
 
Can someone take a look at why the securitymgr server is not shutting down?

Brian Stansberry
Lead, AS Clustering
JBoss, a division of Red Hat
Ph: 510-396-3864
skype: bstansberry