---------- Forwarded message ---------
From: Ondrej Dockal <odockal@redhat.com>
Date: Fri, Dec 16, 2022 at 8:14 PM
Subject: QE Approval for JBT 4.26.0.Final release - main branch is unfrozen
To: adapters-crs-qe <adapters-crs-qe@redhat.com>, Stephane Bouchet <sbouchet@redhat.com>, Jean-Francois Maury <jmaury@redhat.com>, Bianca Nicu <bnicu@redhat.com>, Dominik Jelinek <djelinek@redhat.com>


Hello,

QE approves JBoss Tools 4.26.0.Final bits and so it can be released. There are critical issues (you can find them in the sign-off document below) found in the testing cycle of the bits. Overall state of testing result is as follows:
  • 70 % Passed of all test cases
  • 17 % Failed
  • 13  % Blocked (Explanation can be found in Sign off doc)

The sign-off document can be found here [1].

The main branch is no longer frozen.

Thanks to all engineers involved.

On behalf of JBoss Tools QE and Fuse Tooling QE

Ondrej Dockal
Adapters/JBT QE Lead