On 06/04/2013 11:33 PM, Max Rydahl Andersen wrote:
Await approvals from build, affected team leads and project lead(s). In case of urgency build + one project lead is considered ok, but should be the exception.
Updates of Eclipse version are specifically affecting no-one, and I fear it's not about to get much feedback. It's a low-risk change and the later we apply it, the later we'll know whether everything works fine with newer TP.
A too long feedback loop (several days) is not very possible in the RC stream with a new release of Eclipse release train every week.

To give feedback the changes looks good on first roll but change from planner to slicing (which I normally would consider good)
should be confirmed first. i.e. what dependencies will *not* be included now ?
These could easily escape being detected in builds thus would be great to outline them in such a change.
Have you compared the list of bundles in generated TP with and without this slicing/planner mode ?
It won't affect builds.
The mirror-target-to-repo mojo is actually a "slicer", so the output site for target-platform does not depend on planner/slicer, it's always the same output as slicer. So moving TP from planner to slicer in multiple makes it easier/faster to detect mistakes that used to occur only while validation unified target. Those issues are now detected while validating multiple (about 1 hour earlier).

--
Mickael Istria
Eclipse developer at JBoss, by Red Hat
My blog - My Tweets