[
https://jira.jboss.org/browse/JBPM-2758?page=com.atlassian.jira.plugin.sy...
]
Alejandro Guizar updated JBPM-2758:
-----------------------------------
Original Estimate: 0 minutes
Remaining Estimate: 0 minutes
Assignee: Huisheng Xu (was: Alejandro Guizar)
Hui Sheng, I reopened with the intent of fixing it myself but you beat me to it. I
appreciate it.
Besides removing the extraneous buildProcessEngine call in AssignmentHandlerTest which
caused the spring failure, I trimmed the hibernate configuration files employed with
spring.
NPE on assignmenthandler when using fork/join
---------------------------------------------
Key: JBPM-2758
URL:
https://jira.jboss.org/browse/JBPM-2758
Project: jBPM
Issue Type: Bug
Security Level: Public(Everyone can see)
Components: Runtime Engine
Affects Versions: jBPM 4.3
Reporter: Ronald van Kuijk
Assignee: Huisheng Xu
Fix For: jBPM 4.4
Attachments: JBPM-2758-2010-01-19.patch, JBPM-2758.patch
Original Estimate: 0 minutes
Remaining Estimate: 0 minutes
When using swimalanes on tasks within a fork/join construct and having a task with a
swimlane after the join, an NPE is thrown. For details see the forum.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
https://jira.jboss.org/secure/Administrators.jspa
-
For more information on JIRA, see:
http://www.atlassian.com/software/jira