]
Tom Baeyens reassigned JBPM-165:
--------------------------------
Assignee: Tom Baeyens
process instance versioning
---------------------------
Key: JBPM-165
URL:
https://jira.jboss.org/jira/browse/JBPM-165
Project: JBoss jBPM
Issue Type: Feature Request
Components: Runtime Engine
Reporter: Tom Baeyens
Assignee: Tom Baeyens
Fix For: jBPM 4.1
i think jbpm could offer some degree of assistence in process instance versioning.
when a new version of a process is deployed, jbpm could do the following conversion for a
process instance :
* input required: mapping of the nodes from the old to the new definition.
* cancel the old process instance
* create a new process instance and copy the runtime (exe) information such as tokens and
process variables from the old process instance.
* then establish a special link between the 2 process instances to indicate that the new
process instance is the continuation of the old process instance.
this way we can avoid the problematic conversion of logs, while still keeping them in the
system.
NOTE: i believe that Bernd has got some code for this in jBPM 3. That could be used as a
basis.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: