check optimistic locking in case of loops
-----------------------------------------
Key: JBPM-1214
URL:
https://jira.jboss.org/jira/browse/JBPM-1214
Project: JBoss jBPM
Issue Type: Task
Reporter: Tom Baeyens
Assignee: Joram Barrez
Priority: Minor
Fix For: jBPM 4.0
When a self transition (or bigger loop) comes back to the same wait state in one
transaction, potentially, there might be no updates flushed to the DB.
So we have to check if in that case optimistic locking works as expected and fix it if
necessary.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: