[
https://issues.jboss.org/browse/TEIIDDES-1102?page=com.atlassian.jira.plu...
]
Mark Drilling resolved TEIIDDES-1102.
-------------------------------------
Fix Version/s: 7.7
(was: Future)
Resolution: Done
1) changed so that SQL Results View lands on Results Tab, if the query is successful
2) tab name is DTP function - not overridden
3) could not override Transient Connection Profile Name. We could remove the Profile Name
from the SQL Results View History by changing the property preferences...
Improve the SQL Results View
----------------------------
Key: TEIIDDES-1102
URL:
https://issues.jboss.org/browse/TEIIDDES-1102
Project: Teiid Designer
Issue Type: Enhancement
Components: Datatools Integration
Affects Versions: 7.4
Reporter: Mark Drilling
Assignee: Mark Drilling
Fix For: 7.7
Attachments: SQLResultsView.png
Recommendations to improve the user experience with SQL Results view. Example screenshot
will be attached.
1) When a query is successful, it should remain on the 'result' tab. Instead,
the results table is displayed for a second - then it flips to the 'status' tab.
It should stay on the results. An unsuccessful query should show the status and remain
there.
2) The results are shown on a tab labeled 'Result1'. I don't see a way to
get multiple result tabs. If that's the case, it should just be labeled
'Results' instead of 'Result1'
3) For Preview queries, the 'Connection Profile' column value is not user
readable. It is something like
'Transient.org.teiid.datatools.connectivity.connectionProfile'. For previews, it
should be something that makes sense to the user - maybe 'Preview - localhost - Teiid
Connection' (to be consistent with other connectionProfile infos).
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators:
https://issues.jboss.org/secure/ContactAdministrators!default.jspa
For more information on JIRA, see:
http://www.atlassian.com/software/jira