[
https://issues.jboss.org/browse/TEIIDDES-3025?page=com.atlassian.jira.plu...
]
Andrej Podhradsky edited comment on TEIIDDES-3025 at 1/3/18 9:42 AM:
---------------------------------------------------------------------
Set the priority from Critical to Major since the Fuse Tooling is not a part of
Integration Stack and therefore there is almost no impact on common users.
was (Author: apodhrad):
Set the priority from Critical to Major since the Fuse Tooling is not a part of
Integration Stack and therefore there almost no impact on common users.
Failed to determine if server supports teiid on Fuse on EAP 6.3
---------------------------------------------------------------
Key: TEIIDDES-3025
URL:
https://issues.jboss.org/browse/TEIIDDES-3025
Project: Teiid Designer
Issue Type: Task
Affects Versions: 11.0.1
Environment: Devstudio 10.2.0.GA
Teiid Designer 11.0.1.Final-v20170125-1702-B4135
fuse-eap-6.3.0.R1
Reporter: Andrej Podhradsky
Assignee: Barry LaFond
Fix For: 11.1
Attachments: erroLog.txt, errorLog2.txt
Failed to determine if server supports teiid on Fuse on EAP 6.3.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)