[arquillian-issues] [JBoss JIRA] (ARQ-2065) Combine multiple test results

Bartosz Majsak (JIRA) issues at jboss.org
Tue Dec 13 09:16:01 EST 2016


     [ https://issues.jboss.org/browse/ARQ-2065?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Bartosz Majsak updated ARQ-2065:
--------------------------------
              Status: Pull Request Sent  (was: Open)
    Git Pull Request: https://github.com/arquillian/arquillian-core/pull/120


> Combine multiple test results
> -----------------------------
>
>                 Key: ARQ-2065
>                 URL: https://issues.jboss.org/browse/ARQ-2065
>             Project: Arquillian
>          Issue Type: Feature Request
>          Components: core
>    Affects Versions: 1.1.11.Final
>            Reporter: Bartosz Majsak
>            Assignee: Bartosz Majsak
>            Priority: Minor
>
> With the current implementation in place splitting single test in several executions can only happen from within Arquillian events (so we run n tests from within single test). This in particular happens for running contract tests for Pact, where one test spawns several verifications based on the content of the contract itself.
> Even though the {{List<TestResult>}} is used as a container object for TestResult instance passed along when Test event is fired, it can happen one test can be fired multiple times (for example in arquillian-algeron).
> The temporary solution for this problem could be that all the results are collected into one instance of TestResult.



--