[arquillian-issues] [JBoss JIRA] (ARQ-2065) Combine multiple test results
Bartosz Majsak (JIRA)
issues at jboss.org
Thu Jan 5 11:38:00 EST 2017
[ https://issues.jboss.org/browse/ARQ-2065?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Bartosz Majsak closed ARQ-2065.
-------------------------------
> Combine multiple test results
> -----------------------------
>
> Key: ARQ-2065
> URL: https://issues.jboss.org/browse/ARQ-2065
> Project: Arquillian
> Issue Type: Feature Request
> Components: core
> Affects Versions: 1.1.11.Final
> Reporter: Bartosz Majsak
> Assignee: Bartosz Majsak
> Priority: Minor
> Fix For: 1.1.12.Final
>
>
> With the current implementation in place splitting single test in several executions can only happen from within Arquillian events (so we run n tests from within single test). This in particular happens for running contract tests for Pact, where one test spawns several verifications based on the content of the contract itself.
> Even though the {{List<TestResult>}} is used as a container object for TestResult instance passed along when Test event is fired, it can happen one test can be fired multiple times (for example in arquillian-algeron).
> The temporary solution for this problem could be that all the results are collected into one instance of TestResult.
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the arquillian-issues
mailing list