[infinispan-issues] [JBoss JIRA] Resolved: (ISPN-239) Boolean values in configuration overrides are either lost or overriden incorrectly
Vladimir Blagojevic (JIRA)
jira-events at lists.jboss.org
Wed Oct 28 14:19:05 EDT 2009
[ https://jira.jboss.org/jira/browse/ISPN-239?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Vladimir Blagojevic resolved ISPN-239.
--------------------------------------
Resolution: Done
Fixed fpr 4.0.0 CR1. See Fisheye for change set details
> Boolean values in configuration overrides are either lost or overriden incorrectly
> ----------------------------------------------------------------------------------
>
> Key: ISPN-239
> URL: https://jira.jboss.org/jira/browse/ISPN-239
> Project: Infinispan
> Issue Type: Bug
> Components: Configuration
> Reporter: Galder Zamarreno
> Assignee: Vladimir Blagojevic
> Fix For: 4.0.0.CR1
>
>
> When creating new configurations based on other existing configurations, either:
> - boolean values are being overriden when they shouldn't have been
> - or boolean values of existing configurations are not ported over to new configurations
> Vladimir, this seems related to the work you did on applying configuration overrides, could you please look into it?
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the infinispan-issues
mailing list