[infinispan-issues] [JBoss JIRA] (ISPN-2458) Double unlock during rollback breaks reference counting

Mircea Markus (JIRA) jira-events at lists.jboss.org
Wed Oct 31 07:39:01 EDT 2012


     [ https://issues.jboss.org/browse/ISPN-2458?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Mircea Markus updated ISPN-2458:
--------------------------------

    Fix Version/s: 5.2.0.CR1

    
> Double unlock during rollback breaks reference counting
> -------------------------------------------------------
>
>                 Key: ISPN-2458
>                 URL: https://issues.jboss.org/browse/ISPN-2458
>             Project: Infinispan
>          Issue Type: Bug
>          Components: Locking and Concurrency
>    Affects Versions: 5.2.0.Beta3
>            Reporter: Radim Vansa
>            Assignee: Manik Surtani
>            Priority: Critical
>             Fix For: 5.2.0.CR1
>
>
> Using pessimistic locking, when a transaction is rolled-back, {{RollbackCommand}} and then {{TxCompletionNotification}} commands are sent to the primary owner. When the order of these two changes, the locks are unlocked twice: first by {{TxCompletionNotification}} calling {{LockManagerImpl.unlock(Collection<Object> lockedKeys, Object lockOwner)}} and then by {{AbstractTxLockingInterceptor.visitRollbackCommand}} calling {{LockManagerImpl.unlockAll(...)}}
> When the lock is acquired after the first unlock, the second unlock fails with IllegalMonitorStateException in {{OwnableReentrantLock.tryAcquire(...)}}, but the reference count is still decremented in {{AbstractPerEntryLockContainer.releaseLock(...)}}. This results in further IllegalStateException: Negative reference count for lock 

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira


More information about the infinispan-issues mailing list