[infinispan-issues] [JBoss JIRA] (ISPN-2197) Cache view instalation takes too long
Ondrej Nevelik (JIRA)
jira-events at lists.jboss.org
Mon Sep 10 07:19:32 EDT 2012
[ https://issues.jboss.org/browse/ISPN-2197?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12716943#comment-12716943 ]
Ondrej Nevelik commented on ISPN-2197:
--------------------------------------
Verified. I wasn't able to reproduce the bug with Infinispan that comes with JDG 6.0.1.CR1.
> Cache view instalation takes too long
> -------------------------------------
>
> Key: ISPN-2197
> URL: https://issues.jboss.org/browse/ISPN-2197
> Project: Infinispan
> Issue Type: Bug
> Components: State transfer
> Reporter: Ondrej Nevelik
> Assignee: Dan Berindei
> Fix For: 5.1.7.Final, 5.2.0.Alpha3, 5.2.0.Final
>
>
> ISPN000172: Failed to prepare view CacheView{viewId=14, members=[edg-perf05-63964]} for cache t, rolling back to view CacheView{viewId=11, members=[edg-perf05-63964]}
> java.util.concurrent.ExecutionException: java.lang.IllegalStateException: t: Received cache view prepare request after the local node has already shut down.
> When testing configuration [1] with lots of caches, it takes too long for the caches to shut down - ~20minutes! See the log [2] for more details.. More specifically we are calling cacheManager.stop() method and then waiting for the cacheManager.getMembers() to be <= 0.
> The Infinispan used is the one in JDG 6.0.1.ER2.
> [1] https://svn.devel.redhat.com/repos/jboss-qa/load-testing/etc/jdg-60/radargun/comparison/dist-sync-tx-multicache.xml
> [2] https://jenkins.mw.lab.eng.bos.redhat.com/hudson/view/EDG6/view/JDG-RADARGUN/job/jdg-60-radargun-perf-multicache/24/console-edg-perf05/
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the infinispan-issues
mailing list