[infinispan-issues] [JBoss JIRA] (ISPN-2847) Puts done by state transfer can fail with TimeoutException if lock cannot be acquired

Adrian Nistor (JIRA) jira-events at lists.jboss.org
Fri Feb 22 07:06:56 EST 2013


Adrian Nistor created ISPN-2847:
-----------------------------------

             Summary: Puts done by state transfer can fail with TimeoutException if lock cannot be acquired
                 Key: ISPN-2847
                 URL: https://issues.jboss.org/browse/ISPN-2847
             Project: Infinispan
          Issue Type: Bug
          Components: State transfer
    Affects Versions: 5.2.2.Final, 5.3.0.Final
            Reporter: Adrian Nistor
            Assignee: Adrian Nistor
             Fix For: 5.3.0.Final


On pessimistic tx caches state transfer can fail for individual keys if they are locked by another tx for too long and timeout expires for the state transfer tx. The error is logged but nothing is done to try to recover the error. The value is lost.

This can be reproduced easily by running OperationsDuringStateTransferTest configured with pessimistic tx.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira


More information about the infinispan-issues mailing list