[infinispan-issues] [JBoss JIRA] (ISPN-3157) Realign Infinispan subsystem to match AS7.2/EAP6.1
RH Bugzilla Integration (JIRA)
jira-events at lists.jboss.org
Thu Jun 27 12:01:21 EDT 2013
[ https://issues.jboss.org/browse/ISPN-3157?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12785786#comment-12785786 ]
RH Bugzilla Integration commented on ISPN-3157:
-----------------------------------------------
Shay Matasaro <smatasar at redhat.com> made a comment on [bug 973763|https://bugzilla.redhat.com/show_bug.cgi?id=973763]
cherry picking ISP-3157 introduces a dependency on
org.jboss.as.controller.AttributeMarshaller;
org.jboss.as.controller.OperationDefinition;
these classes dont exist in the latest version of eap which is:
jboss-as-controller-7.1.3.final-redhat-4
current options are :
1) Patch jboss-as-controller in EAP
2) Rewrite the patch so it doesn't need jboss-as-controller changes
3) Not do the patch because it's too complicated
still considering the best option...
> Realign Infinispan subsystem to match AS7.2/EAP6.1
> --------------------------------------------------
>
> Key: ISPN-3157
> URL: https://issues.jboss.org/browse/ISPN-3157
> Project: Infinispan
> Issue Type: Task
> Components: Server
> Reporter: Tristan Tarrant
> Assignee: Tristan Tarrant
> Priority: Critical
> Fix For: 5.3.0.Final
>
>
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the infinispan-issues
mailing list