[infinispan-issues] [JBoss JIRA] (ISPN-2990) L1ManagerImpl doesn't reliably invalidate with async caches

Mircea Markus (JIRA) jira-events at lists.jboss.org
Tue May 7 06:59:53 EDT 2013


     [ https://issues.jboss.org/browse/ISPN-2990?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Mircea Markus updated ISPN-2990:
--------------------------------

    Labels: onboard  (was: )

    
> L1ManagerImpl doesn't reliably invalidate with async caches
> -----------------------------------------------------------
>
>                 Key: ISPN-2990
>                 URL: https://issues.jboss.org/browse/ISPN-2990
>             Project: Infinispan
>          Issue Type: Bug
>          Components: Distributed Cache
>    Affects Versions: 5.2.1.Final
>            Reporter: Sebastian Tusk
>            Assignee: Mircea Markus
>              Labels: onboard
>
> B is owner of k,v1
> A has k,v1 in L1
> 1. TX: A puts k,v2
> 2. TX: A sends async PrepareCommand k,v2 to B (one-phase-commit)
> 3. TX: A removes k,v1 from L1
> 4. A putForExternalRead k,v1 and has it in L1 again
> 5. TX: B executes PrepareCommand k,v2 but doesn't send invalidation to origin
> Result: A has k,v1 and B has k,v2
> Solution: For async caches send invalidation to origin too.
> The problem is that the owner updates the cache entry asynchronously. This gives the origin of the transaction time to request the entry. Here an outdated version is received and placed in L1. The owner never invalidates the entry and as result the cache is inconsistent.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira


More information about the infinispan-issues mailing list