[infinispan-issues] [JBoss JIRA] (ISPN-4131) Lock acquired forever with delayed PrepareCommand
Radim Vansa (JIRA)
issues at jboss.org
Tue Mar 18 09:50:10 EDT 2014
Radim Vansa created ISPN-4131:
---------------------------------
Summary: Lock acquired forever with delayed PrepareCommand
Key: ISPN-4131
URL: https://issues.jboss.org/browse/ISPN-4131
Project: Infinispan
Issue Type: Bug
Components: Transactions
Affects Versions: 7.0.0.Alpha1
Reporter: Radim Vansa
Assignee: Dan Berindei
Distributed transactional cache:
1. A sends Prepare to B
2. B receives Prepare, but due to ongoing ST it is blocked
3. B replication timeout elapses
4. B sends Rollback, this does not find the TX as Prepare was not executed yet. The transaction is put into completedTransactions.
5. Completed transactions timeout elapses. This is by default 15 seconds, way shorter than ST timeout (due to which the Prepare was blocked)
6. Prepare is executed on B, acquiring lock on K
Nobody will rollback the TX as originator things it was already rolled back.
Result: key K will be locked forever
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the infinispan-issues
mailing list