[infinispan-issues] [JBoss JIRA] (ISPN-5019) After coordinator change, cache topologies should be installed in parallel

Dan Berindei (JIRA) issues at jboss.org
Wed Nov 26 03:00:40 EST 2014


Dan Berindei created ISPN-5019:
----------------------------------

             Summary: After coordinator change, cache topologies should be installed in parallel
                 Key: ISPN-5019
                 URL: https://issues.jboss.org/browse/ISPN-5019
             Project: Infinispan
          Issue Type: Bug
          Components: Core
    Affects Versions: 7.0.2.Final
            Reporter: Dan Berindei
            Priority: Critical
             Fix For: 7.1.0.Alpha1


When the coordinator crashes, the new coordinator has to recover the cache topologies from all the nodes in the cluster and install updated topologies for all the caches. This is done on a single thread, and it can take a long time when there are a lot of caches.

We should be accelerate this by doing the topology installation on separate threads. However, we have to be careful with the async transport pool, because {{executeOnClusterAsync}} actually needs to spawn a new thread in the same pool.



--
This message was sent by Atlassian JIRA
(v6.3.8#6338)


More information about the infinispan-issues mailing list