[infinispan-issues] [JBoss JIRA] (ISPN-5158) Transaction rolled back but returns successful response
Radim Vansa (JIRA)
issues at jboss.org
Tue Jan 20 06:44:49 EST 2015
[ https://issues.jboss.org/browse/ISPN-5158?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13033789#comment-13033789 ]
Radim Vansa commented on ISPN-5158:
-----------------------------------
This looks like a limitation of the current fix, right? Or is there any conceptual problem with setting the origin properly?
And does that mean that the locking get() will sometimes return incorrect results, sometimes fail or always fail?
In both cases, could you link another JIRA + BZ to track the limitation?
> Transaction rolled back but returns successful response
> -------------------------------------------------------
>
> Key: ISPN-5158
> URL: https://issues.jboss.org/browse/ISPN-5158
> Project: Infinispan
> Issue Type: Bug
> Components: Core
> Affects Versions: 7.1.0.Beta1
> Reporter: Radim Vansa
> Assignee: Dan Berindei
> Priority: Critical
> Attachments: tx.txt, views.txt
>
>
> When the cluster is merging, it is possible that a node is removed from the view although it is still responsive. Eventually the cluster is merged correctly, but since the node is reported as missing from the view, transaction originating from this node is rolled back.
> {code}
> 10:01:36,116 TRACE [org.infinispan.interceptors.TxInterceptor] (remote-thread-151) Rolling back remote transaction GlobalTransaction:<edg-perf02-39415>:28106:remote because either already completed(false) or originator no longer in the cluster(true).
> {code}
> However, even after this a successful response is sent to the originator:
> {code}
> 10:01:36,119 TRACE [org.infinispan.remoting.InboundInvocationHandlerImpl] (remote-thread-151) About to send back response null for command PrepareCommand {modifications=[PutKeyValueCommand{key=key_0000000000001318, value=[19 #1: 1195, ], flags=[SKIP_CACHE_LOAD, SKIP_REMOTE_LOOKUP], putIfAbsent=false, valueMatcher=MATCH_ALWAYS, metadata=EmbeddedMetadata{version=null}, successful=true}], onePhaseCommit=false, gtx=GlobalTransaction:<edg-perf02-39415>:28106:remote, cacheName='testCache', topologyId=47}
> {code}
> Originator then expects that the transaction was successfully prepared:
> {code}
> 10:01:36,124 TRACE [org.infinispan.remoting.transport.jgroups.CommandAwareRpcDispatcher] (DefaultStressor-9) Responses: [sender=edg-perf01-36235, received=true, suspected=false]
> [sender=edg-perf03-24110, received=true, suspected=false]
> 10:01:36,135 TRACE [org.infinispan.transaction.TransactionCoordinator] (DefaultStressor-9) Committing transaction GlobalTransaction:<edg-perf02-39415>:28106:local
> {code}
--
This message was sent by Atlassian JIRA
(v6.3.11#6341)
More information about the infinispan-issues
mailing list