[infinispan-issues] [JBoss JIRA] (ISPN-5600) Optimize transactions on multiple caches

Radim Vansa (JIRA) issues at jboss.org
Mon Jul 13 09:25:04 EDT 2015


     [ https://issues.jboss.org/browse/ISPN-5600?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Radim Vansa updated ISPN-5600:
------------------------------
    Affects Version/s: 8.0.0.Alpha2


> Optimize transactions on multiple caches
> ----------------------------------------
>
>                 Key: ISPN-5600
>                 URL: https://issues.jboss.org/browse/ISPN-5600
>             Project: Infinispan
>          Issue Type: Enhancement
>    Affects Versions: 8.0.0.Alpha2
>            Reporter: Radim Vansa
>
> NON_XA transactions that span multiple caches are registered as multiple synchronizations, and these synchronizations are often processed sequentially ^1^; therefore, we send synchronous PrepareCommand for each cache and then CommitCommand for each cache as well, delaying the commit by these round-trips.
> Since the targets for different caches may differ, we still need to send the RPCs separately, but in parallel. Therefore, there should be one uber-synchronization for all caches that use NON_XA mode (and maybe something similar with XA). I believe that using single synchronization could save some allocations, too.
> ^1^ Not sure if full-fledged JTA implementations do that; JTA spec does not say anything about the order of synchronizations and whether these should be processed in parallel.



--
This message was sent by Atlassian JIRA
(v6.3.15#6346)


More information about the infinispan-issues mailing list