[infinispan-issues] [JBoss JIRA] (ISPN-4891) ExpiryTest failures caused by ISPN-4836

RH Bugzilla Integration (JIRA) issues at jboss.org
Mon May 18 08:50:19 EDT 2015


     [ https://issues.jboss.org/browse/ISPN-4891?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

RH Bugzilla Integration updated ISPN-4891:
------------------------------------------
        Bugzilla Update: Perform
    Bugzilla References: https://bugzilla.redhat.com/show_bug.cgi?id=1222527


> ExpiryTest failures caused by ISPN-4836
> ---------------------------------------
>
>                 Key: ISPN-4891
>                 URL: https://issues.jboss.org/browse/ISPN-4891
>             Project: Infinispan
>          Issue Type: Bug
>            Reporter: Pedro Ruivo
>            Assignee: William Burns
>             Fix For: 7.0.0.Final
>
>
> The following tests are failing:
> {code}
>   ExpiryTest.testEntrySetAfterExpiryInPut:233->doTestEntrySetAfterExpiryInPut:283 expected:<[1=v1-testEntrySetAfterExpiryInPut, 2=v2-testEntrySetAfterExpiryInPut]> but was:<[]>
>   ExpiryTest.testKeySetAfterExpiryInTransaction:370->doKeySetAfterExpiryInTransaction:402 expected:<[1, 2, 3]> but was:<[3]>
> {code}
> A possible solution (by Dan) would be to copy to make sure the entries don't disappear from the set.



--
This message was sent by Atlassian JIRA
(v6.3.15#6346)


More information about the infinispan-issues mailing list