[infinispan-issues] [JBoss JIRA] (ISPN-6923) HotRod bulk commands that provide a limit need to close the iterator

William Burns (JIRA) issues at jboss.org
Wed Aug 3 20:18:00 EDT 2016


     [ https://issues.jboss.org/browse/ISPN-6923?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

William Burns updated ISPN-6923:
--------------------------------
    Fix Version/s: 9.0.0.Beta1
                       (was: 9.0.0.Alpha4)


> HotRod bulk commands that provide a limit need to close the iterator
> --------------------------------------------------------------------
>
>                 Key: ISPN-6923
>                 URL: https://issues.jboss.org/browse/ISPN-6923
>             Project: Infinispan
>          Issue Type: Bug
>          Components: Server
>    Affects Versions: 8.0.0.Final
>            Reporter: William Burns
>             Fix For: 9.0.0.Beta1, 8.2.4.Final
>
>
> When using a cache that is distributed and a hotrod bulk operation with a count the entries or keys are not fully iterated upon, which requires the iterator to be manually closed or else this will consume a thread per request until the server runs out of resources.



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the infinispan-issues mailing list