[infinispan-issues] [JBoss JIRA] (ISPN-5727) Client Listener removal and shutdown problems

RH Bugzilla Integration (JIRA) issues at jboss.org
Wed Jan 13 04:35:00 EST 2016


    [ https://issues.jboss.org/browse/ISPN-5727?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13147936#comment-13147936 ] 

RH Bugzilla Integration commented on ISPN-5727:
-----------------------------------------------

Adrian Nistor <anistor at redhat.com> changed the Status of [bug 1297930|https://bugzilla.redhat.com/show_bug.cgi?id=1297930] from NEW to POST

> Client Listener removal and shutdown problems
> ---------------------------------------------
>
>                 Key: ISPN-5727
>                 URL: https://issues.jboss.org/browse/ISPN-5727
>             Project: Infinispan
>          Issue Type: Bug
>    Affects Versions: 8.0.0.Final
>            Reporter: Galder Zamarreño
>            Assignee: Galder Zamarreño
>             Fix For: 8.1.0.Final, 8.0.2.Final
>
>
> There are a couple of problems related to client listener registration on the client:
> 1. When shutting down a remote cache manager to which client listeners have been added, even if the user does not remove them individually, stopping the remote cache manager should shutdown all client-side client listener threads. This is not the case right now.
> 2. When removing a client listener, the client listener thread needs to be stopped.



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)



More information about the infinispan-issues mailing list