[infinispan-issues] [JBoss JIRA] (ISPN-6423) Move clustering.sync.replTimeout to clustering.remoteTimeout

Dan Berindei (JIRA) issues at jboss.org
Tue Mar 22 11:47:00 EDT 2016


     [ https://issues.jboss.org/browse/ISPN-6423?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Dan Berindei updated ISPN-6423:
-------------------------------
    Status: Open  (was: New)


> Move clustering.sync.replTimeout to clustering.remoteTimeout
> ------------------------------------------------------------
>
>                 Key: ISPN-6423
>                 URL: https://issues.jboss.org/browse/ISPN-6423
>             Project: Infinispan
>          Issue Type: Task
>          Components: Configuration, Core
>    Affects Versions: 8.2.0.Final
>            Reporter: Dan Berindei
>            Assignee: Dan Berindei
>             Fix For: 9.0.0.Final, 9.0.0.Alpha1
>
>
> The async configuration is already being removed with ISPN-6417, we should prepare to remove the sync configuration as well (replTimeout is now the only attribute).
> The XML configuration already uses a {{remote-timeout}} attribute directly on the cache element, so this change would better align the programmatic and XML configurations.



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the infinispan-issues mailing list