[infinispan-issues] [JBoss JIRA] (ISPN-5476) Cross-site tests should run in parallel
Tristan Tarrant (JIRA)
issues at jboss.org
Tue May 17 08:22:12 EDT 2016
[ https://issues.jboss.org/browse/ISPN-5476?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Tristan Tarrant updated ISPN-5476:
----------------------------------
Fix Version/s: 9.0.0.Alpha3
(was: 9.0.0.Alpha2)
> Cross-site tests should run in parallel
> ---------------------------------------
>
> Key: ISPN-5476
> URL: https://issues.jboss.org/browse/ISPN-5476
> Project: Infinispan
> Issue Type: Task
> Components: Core, Cross-Site Replication, Test Suite - Core
> Affects Versions: 7.2.1.Final
> Reporter: Dan Berindei
> Fix For: 9.0.0.Alpha3
>
>
> Currently the cross-site tests have to run in a single thread, and that means they're much slower than the regular core tests.
> It also means they need to run with a separate Maven profile, and that (combined with their duration) makes it very unlikely for devs to run the xsite tests on their machines.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the infinispan-issues
mailing list