[infinispan-issues] [JBoss JIRA] (ISPN-7728) Run the stress test serially
Dan Berindei (JIRA)
issues at jboss.org
Tue Apr 18 02:11:00 EDT 2017
[ https://issues.jboss.org/browse/ISPN-7728?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Dan Berindei updated ISPN-7728:
-------------------------------
Status: Open (was: New)
> Run the stress test serially
> ----------------------------
>
> Key: ISPN-7728
> URL: https://issues.jboss.org/browse/ISPN-7728
> Project: Infinispan
> Issue Type: Task
> Components: Build process
> Affects Versions: 9.0.0.Final
> Reporter: Dan Berindei
> Assignee: Dan Berindei
> Labels: testsuite_stability
> Fix For: 9.1.0.Final
>
>
> Currently the {{test-stress}} profile runs the stress tests with the default number of threads (15). Considering that stress tests are heavy CPU users, it's better to run them on a single thread.
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the infinispan-issues
mailing list