[infinispan-issues] [JBoss JIRA] (ISPN-6599) PutAll operation in the Hot Rod client only partially completed during topology changes

Gustavo Fernandes (JIRA) issues at jboss.org
Fri Jan 13 04:27:00 EST 2017


    [ https://issues.jboss.org/browse/ISPN-6599?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13347702#comment-13347702 ] 

Gustavo Fernandes edited comment on ISPN-6599 at 1/13/17 4:26 AM:
------------------------------------------------------------------

Attached trace from one the failed runs of the reproducer (infinispan.log is the HR client and servers) against master.
 
Background: cluster started with 3 nodes (server0, server1 and server2), and at some point server0 was killed. 

At the end of the test, cache.size = 999 (should be 1000) and the missing key was *0x034b0000000a*

Inspecting the data container of the servers , one ends with 997 entries and the other with 999.

Curious enough, doing cache.keySet.size alternates returning of 999 and 997 entries.




was (Author: gustavonalle):
Attached trace from one the failed runs of the reproducer (infinispan.log is the HR client and servers).
 
Background: cluster started with 3 nodes (server0, server1 and server2), and at some point server0 was killed. 

At the end of the test, cache.size = 999 (should be 1000) and the missing key was *0x034b0000000a*

Inspecting the data container of the servers , one ends with 997 entries and the other with 999.

Curious enough, doing cache.keySet.size alternates returning of 999 and 997 entries.



> PutAll operation in the Hot Rod client only partially completed during topology changes
> ---------------------------------------------------------------------------------------
>
>                 Key: ISPN-6599
>                 URL: https://issues.jboss.org/browse/ISPN-6599
>             Project: Infinispan
>          Issue Type: Bug
>          Components: Server
>    Affects Versions: 8.2.1.Final, 9.0.0.Alpha1
>            Reporter: Gustavo Fernandes
>            Assignee: Dan Berindei
>             Fix For: 9.0.0.Alpha2, 8.2.2.Final, 9.0.0.Final
>
>         Attachments: reproducer.zip, trace.tgz
>
>




--
This message was sent by Atlassian JIRA
(v7.2.3#72005)