[infinispan-issues] [JBoss JIRA] (ISPN-8973) Administration console - changing eviction strategy results in error
Vladimir Blagojevic (JIRA)
issues at jboss.org
Mon Apr 2 06:41:02 EDT 2018
[ https://issues.jboss.org/browse/ISPN-8973?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13554584#comment-13554584 ]
Vladimir Blagojevic commented on ISPN-8973:
-------------------------------------------
[~rmacor] I am trying this on server master and it works for me. Have you used official Infinispan 9.2.0 server distribution?
> Administration console - changing eviction strategy results in error
> --------------------------------------------------------------------
>
> Key: ISPN-8973
> URL: https://issues.jboss.org/browse/ISPN-8973
> Project: Infinispan
> Issue Type: Bug
> Components: JMX, reporting and management
> Affects Versions: 9.2.0.Final
> Reporter: Roman Macor
> Assignee: Vladimir Blagojevic
>
> Steps to reproduce:
> - start server in domain mode
> - click on cache container -> cache -> configuration -> memory tab -> set memory
> - e.g. (Type: binary, Eviction: count, Size: 10, strategy: FIFO)
> - apply changes -> restart now
> - change the strategy to LRU, click apply changes
> That results in error popup:
> {"WFLYDC0074: Operation failed or was rolled back on all servers. Server failures:":{"server-group":{"cluster":{"host":{"master":{"server-one":{"WFLYCTL0062: Composite operation failed and was rolled back. Steps that failed:":{"Operation step-3":"WFLYCTL0158: Operation handler failed: java.lang.NullPointerException"}},"server-two":{"WFLYCTL0062: Composite operation failed and was rolled back. Steps that failed:":{"Operation step-3":"WFLYCTL0158: Operation handler failed: java.lang.NullPointerException"}}}}}}}}
> There are no error logs in the server log.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
More information about the infinispan-issues
mailing list